I think because of the virus in addition to nobody wanting to work now, it is impossible to get stuff! If I would have known sooner, I wouldn’t have gutted our entryway.
I am in the midst of a big time remodel though.
I can’t back out now. I have been waiting on entryway cabinets for 2 weeks. I have our upper cabinet knobs but not our lower cabinet handles! My sink is in, but the vanity light is out. I just got a message that our new entryway window is finally at the store, but the concern is that I want to do the flooring before everything else. I decided that I was going to do heated flooring in the entryway. I also choose not to go through a HVAC company, and rather than spend our money on their prices in addition to hiring a HVAC supplier, I would go through a hardware store! Well everything was out of stock in addition to supposed to come within a week. It has been weeks in addition to no word on our electric heated mats. I only have so much time. My entryway isn’t entirely large which means I can hastily slap down stone floors if I need to. I can’t have our entryway cabinets come in in addition to not having floors though. I paid for the update by the company after all, so I have a limited amount of time before I just lose out on this heating system. I have debated canceling our order in addition to seeing if the local HVAC company will do a rush job on radiant flooring upgrade. It would be costly but also nice to not do this part of the project.